  "title": "PROENGINEERING Electrical Engineering Project Starter Pack",
  "version": "2026.1",
  "author": "Amaresh Das (amaresh.das@proengineering.com)",
  "website": "https://proengineering.in",
  "license": "Single-User Engineering Project Commercial License",
  "resources": [
    {
      "name": "Industrial Load Schedule Quick-Sizing Reference",
      "format": "Excel Reference Template",
      "standards": ["IEC 60076", "IS 2026", "IEEE 141"],
      "summary": "Quick formula guide for connected load, demand factor, diversity factor, and transformer sizing margin."
    },
    {
      "name": "LV/MV Cable Sizing & De-rating Rules of Thumb",
      "format": "Technical Reference Protocol",
      "standards": ["IEC 60287", "IEC 60502-2", "IS 732"],
      "summary": "Ambient temperature, soil thermal resistivity, grouping factor, and allowable voltage drop criteria."
    },
    {
      "name": "HV/MV Substation Pre-Commissioning Critical Hold-Points",
      "format": "QA/QC Inspection Protocol",
      "standards": ["IEC 62271-100", "IEEE C37.010", "IS 10118"],
      "summary": "15 essential pre-energization electrical checks for switchgear, VCB, CT/PT, relays, and busbars."
    },
    {
      "name": "Electrical Root Cause Analysis (RCA) 5-Why Incident Worksheet",
      "format": "Safety & Reliability Template",
      "standards": ["OSHA 1910.303", "NFPA 70E", "ISO 9001"],
      "summary": "Standardized incident reporting structure for electrical switchgear trips, cable faults, and flashovers."
    }
  ],
  "contact": "For technical queries or customized industrial engineering models, contact amaresh.das@proengineering.com"
}